A contract for the disassembly and assembly of track and catenary systems for the task: “Revitalisation of rail line no. 139 on the Żywiec – Węgierska Górka route, as a part of an investment project named: “Works over the rail line no. 139 at the Czechowice-Dziedzice – Bielsko-Biała – Zwardoń (domestic border) section””.
Contract duration: 30/08/2018 to 07/11/2018.
The scope of works covered:
– disassembly of double-wire track system – 9.17 km
– disassembly of weight anchoring – 22 units
– assembly of structures on pile foundations – 231 units
– assembly of stay wires – 68 units
– assembly of system suspensions – 231 units
The above works were completed for Skanska S.A.