A contract for disassembly and assembly of track and catenary systems for the task:
“Design and completion of civil works at the Idzikowice station, as a part of the project named “Upgrade of the rail line no. 4 – Central Rail Line, stage 2””.
Contract duration: 01/10/2018 to 25/11/2019.
The scope of works covered:
– disassembly of double-track, double-wire track system – 13.48 km
– disassembly of station track system – 11.60 km
– disassembly of supporting structures – 397 units
– assembly of supporting structures – 286 units
– assembly of supporting structures for earth rods – 288 units
– assembly of collective structure bonding line AFI-6-120 with connections – 5.00 km
– assembly of disconnectors and circuit breakers with connections – 21 units
– assembly of conical surge arresters with connections – 34 units
– assembly of low voltage current limiters with connections – 6 units
– replacement of catenary system anchoring – 4 sets
The above works were completed for Budimex S.A.